Thermal Farm Assessment
Two-day bench and rack evaluation measuring heat output, hashrate stability, and colocation fit for units at 0.05 TH/s and above.
- From ₩450,000 per unit
- 2 business days
- Jeonju assessment lab + optional on-site rack test
- Written report with thermal charts and placement recommendation
Who this is for
Operators and small hosting clients who plan to send ASIC or high-output GPU miners to a third-party farm in South Korea. If your unit is rated at or above 0.05 TH/s sustained output, it qualifies for this assessment track.
What we deliver
A written report covering:
- Sustained hashrate measured over a 24-hour duty cycle at farm-representative ambient temperature (22–26°C)
- Thermal signature map including exhaust temperature, chassis hotspot locations, and inlet-to-outlet delta
- Power draw consistency across the test window, noting spikes during fan ramp events
- Hosted-farm placement score for typical Jeonju-area colocation layouts (end-of-row, middle density, isolated bay)
- Noise and vibration notes relevant to shared rack environments
Process
- Intake call — You share model, firmware version, prior hosting history, and target farm constraints.
- Bench session (Day 1) — Unit runs in our Jeonju lab under controlled load. We attach thermal probes and log power at 15-minute intervals.
- Rack simulation (Day 2) — Unit is placed in our reference rack with adjacent blanking panels to mimic hosted density. Heat bleed to neighboring positions is recorded.
- Report delivery — PDF report with charts, photos, and a plain-language placement recommendation within 48 hours of test completion.
Included
- Lab bench time and reference rack simulation
- Thermal probe placement and data logging
- Hashrate verification against manufacturer spec at test conditions
- One round of clarification questions by email within 7 days
Not included
- Repair, firmware modification, or overclocking services
- Long-term burn-in beyond 48 hours
- Farm contract negotiation or colocation broker services
- Units below 0.05 TH/s sustained hashrate
Preparation
Ship or deliver the unit to our Jeonju office with original power cables. Clean dust from heatsinks before arrival. Include any custom fan configurations so we test the configuration you intend to host.
Next step
Submit an inquiry through our contact form with unit model, quantity, and target hosting timeline. We confirm scheduling within two business days.