Farm Readiness Guide

Before your units leave for colocation

Hosted farms allocate rack positions by heat density, not by purchase date. This guide summarizes how we score readiness for miners at 0.05 TH/s and above — the same criteria used in our thermal farm assessment reports.

Thermal profile tiers

TierExhaust delta (typical)Rack placement
AUnder 8°C sustainedMiddle density permitted
B8–11°C sustainedEnd-of-row or aisle with extra clearance
CAbove 11°C sustainedIsolated bay or dedicated exhaust duct

Tiers are assigned from logged data, not manufacturer brochures.

Rack orientation checklist

  • Exhaust points toward hot aisle or duct opening
  • Blank panels on empty neighboring U spaces when farm policy allows
  • Power PDU on same phase plan documented by farm
  • Network drop verified before thermal load test at farm

Documentation to gather from your farm partner

  1. Maximum watts per U allowed in your contract tier
  2. Ambient temperature guarantee range
  3. Maintenance windows that cycle aisle load
  4. Procedure when aisle temperature alarms trigger

Jeonju corridor notes

Facilities near our office often use 42U racks with 1.1m aisles. Tier B units are commonly placed in positions 38–42 and 1–4 at end rows. Always confirm with your specific operator — layouts vary.

When to commission a full assessment

If you lack thermal data, if you are mixing models in one aisle, or if you are signing a new colocation contract, bench testing before shipment prevents costly repositioning. Our flagship thermal farm assessment covers the full two-day protocol.